>Service and Support >SINEE Class >EM730-Trial operation/debugging/Motor parameter setting
Aug 27, 2024
EM730-Trial operation/debugging/Motor parameter setting

01 Trial operation and debugging

The test run of the frequency converter is an important step to ensure that the frequency converter and its control system can operate stably and meet expected performance before it is officially put into use. The following is a detailed introduction to the test run of the frequency converter:


Step:

trial operation and debugging.png

Video demonstration: https://youtu.be/ITaVHfT0g6I


02 Motor parameter setting

The parameter setting of the inverter motor is an important step in the debugging process of the inverter, which directly affects the operating performance and efficiency of the motor. The following is a detailed introduction to the motor parameter settings:


Step:

Motor Parameter Settings.png

Video demonstration: https://youtu.be/u3wxBUuENxQ


Address : Floor 5, Building 7, Antuoshan High-tech Industrial Park, Sha'er Community, Shajing Street, Bao'an District, Shenzhen, China
Tel : 027-87002560
Fax : 86-0755-86267216
  • 首页
  • 联系电话
  • 留言
  • 返回顶部
  • Leave a message
    点击更换验证码